国产精品久久久夜夜高潮,人妻一区久久蜜桃,男人边吃奶边揉好爽免费视频,精品久久久噜噜噜久久久

TEL:+86-183-6006-7777
       +86-188-0063-3336

WELCOME TO JIANGSU HUAZHENG PIPELINE TECHNOLOGY CO., LTD!

ABOUT | PRODUCT | NEWS | CONTACT |

COMMITTED TO CREATING VARIOUS DRAINAGE PIPE MATERIAL

PROFESSIONAL SUPPLIER OF URBAN PIPELINE TRANSMISSION SYSTEM

NEWS
CONTACT US
Jiangsu Huazheng Pipeline Technology Co., Ltd
person: Manager Zhou

Mobile: +86-1836-006-7777

            +86-188-0063-3336

Tel: +86-0527-84550877
Web: www.zzuzl.cn
Add: No.23 Kegong Road,Economic Development Zone, Sucheng District, Suqian city, Jiangsu Province, China


Quality problems in connection and construction of steel strip and pipe
2019-1-8
source:unknown
clicks:  8825        作者:未知
  • At present, the plastic pipe market is not standardized, and the connection products of steel reinforced polyethylene spiral corrugated pipe are no exception. There is no industry standard for heat shrinkable pipe and electric heating pipe used by steel belt pipe manufacturers. The units producing connection parts do not know enough about the characteristics of PE pipe, lack of different products adapting to the structural characteristics of different PE structure wall pipes, and lack of high-quality products to meet the requirements of use. To ensure the quality of the connection. It is suggested that strong production units of connected products should participate in the 8219
    According to our understanding, there are many problems in the quality of construction operation of steel strip pipe connection. Generally, the mechanism of PE pipe connection structure is not well understood, and the structural characteristics of different wall pipes are often neglected. There is a lack of operation procedures verified by connection quality, and operators can not grasp the temperature well.
    From the above several connection technologies, we can see that although the connection construction is not a very complex technical work, the quality of the connection has a great relationship with the quality and working attitude of the construction personnel. The management of the connection construction personnel should be strengthened. All the employees must undergo technical training and pass the examination to be certified.
    We believe that the industry should attach great importance to the quality of sewage pipe materials and sewage pipe connection technology. The key to promote the development of new pipelines is to solve the quality control of the production and on-site operation of the connecting parts.

Address: No.23 Kegong Road,Economic Development Zone, Sucheng District, Suqian city, Jiangsu Province, China  tel: +86-1836-006-7777/+86-188-0063-3336/+86-0527-84550877 Fax: +86-0527-84550877

All Rights Reserved: Jiangsu Huazheng Pipe Technology Co., Ltd. Su ICP Prepared: Su ICP Prepared 16060068 Technical Support: Suqian Webbo

主站蜘蛛池模板: 伊金霍洛旗| 桐柏县| 台东市| 正镶白旗| 都江堰市| 增城市| 临西县| 郸城县| 苗栗市| 榆树市| 会昌县| 隆回县| 九寨沟县| 海南省| 石渠县| 伊宁县| 木兰县| 沾化县| 彭山县| 甘谷县| 涿鹿县| 尚义县| 叶城县| 宁明县| 阆中市| 北流市| 澄迈县| 抚州市| 莱西市| 武汉市| 西华县| 广宗县| 天柱县| 兴宁市| 南部县| 海城市| 东光县| 阳山县| 通辽市| 清水县| 弋阳县|