国产精品久久久夜夜高潮,人妻一区久久蜜桃,男人边吃奶边揉好爽免费视频,精品久久久噜噜噜久久久

TEL:+86-183-6006-7777
       +86-188-0063-3336

WELCOME TO JIANGSU HUAZHENG PIPELINE TECHNOLOGY CO., LTD!

ABOUT | PRODUCT | NEWS | CONTACT |

COMMITTED TO CREATING VARIOUS DRAINAGE PIPE MATERIAL

PROFESSIONAL SUPPLIER OF URBAN PIPELINE TRANSMISSION SYSTEM

NEWS
CONTACT US
Jiangsu Huazheng Pipeline Technology Co., Ltd
person: Manager Zhou

Mobile: +86-1836-006-7777

            +86-188-0063-3336

Tel: +86-0527-84550877
Web: www.zzuzl.cn
Add: No.23 Kegong Road,Economic Development Zone, Sucheng District, Suqian city, Jiangsu Province, China


Analysis of Connection Method of Steel Strip Pipe
2019-1-8
source:unknown
clicks:  7631        作者:未知
  • There are several ways to connect steel strip and pipe:
    Hot melt extrusion welding, electric melt tape connection, heat shrinkable pipe (belt) connection and clamp connection can be used for the connection of_spiral ports. When connecting, the spiral ports of the pipe should be used to minimize the gap.
    _1. Hot-melt extrusion welding connection should be heated by special extrusion welding tools and extrusion welding rods to melt the adjacent pipe ends into a whole polyethylene material, which is a rigid connection method.
    _2. The connection of the electric melt Belt should be made by heating the polyethylene layer embedded in the inner surface of the electric melt belt to melt the polyethylene layer between the electric melt belt and the pipe trough into a whole, which is a rigid connection method.
    _3. The connection of heat-shrinkable tube (belt) should be heated by flame to make the hot melt adhesive on the inner surface of the shrinkable tube (belt) adhere to the outer surface of the tube; the heat-shrinkable tube (belt) forms a constant wrapping force after cooling and solidification, which belongs to the rigid connection method.
    _4. The clamp connection should be bolted to fasten two semi-circular outer sleeves, so that the adjacent pipe ends can be tightened, and the rubber plug between sleeves and pipe walls can meet the sealing requirements, which is a rigid connection method.
    Attention: The above connection methods can be combined to meet the design requirements. When rigid connection is adopted in pipeline, measures such as timely soil covering should be taken to reduce the longitudinal shrinkage of pipeline.
    Measures should be taken to prevent pipeline from floating during construction in rainy season. When the bubbles are found after the installation of the pipeline without covering the soil, the elevation of the center and bottom of the pipeline should be re-measured and inspected. If displacement, floating, drawing and other phenomena are found, they should be handled in time.

Address: No.23 Kegong Road,Economic Development Zone, Sucheng District, Suqian city, Jiangsu Province, China  tel: +86-1836-006-7777/+86-188-0063-3336/+86-0527-84550877 Fax: +86-0527-84550877

All Rights Reserved: Jiangsu Huazheng Pipe Technology Co., Ltd. Su ICP Prepared: Su ICP Prepared 16060068 Technical Support: Suqian Webbo

主站蜘蛛池模板: 甘泉县| 光泽县| 兰州市| 赣州市| 师宗县| 新龙县| 汉源县| 凤山县| 乐安县| 石城县| 灌南县| 康平县| 北辰区| 兴海县| 桃园县| 长乐市| 称多县| 颍上县| 北碚区| 荥经县| 县级市| 嘉义市| 平阳县| 滨海县| 孝昌县| 和政县| 麦盖提县| 黄山市| 泰和县| 井研县| 道真| 恭城| 封开县| 绥化市| 鲜城| 九龙城区| 河北区| 沭阳县| 时尚| 五河县| 扬州市|