国产精品久久久夜夜高潮,人妻一区久久蜜桃,男人边吃奶边揉好爽免费视频,精品久久久噜噜噜久久久

TEL:+86-183-6006-7777
       +86-188-0063-3336

WELCOME TO JIANGSU HUAZHENG PIPELINE TECHNOLOGY CO., LTD!

ABOUT | PRODUCT | NEWS | CONTACT |

COMMITTED TO CREATING VARIOUS DRAINAGE PIPE MATERIAL

PROFESSIONAL SUPPLIER OF URBAN PIPELINE TRANSMISSION SYSTEM

NEWS
CONTACT US
Jiangsu Huazheng Pipeline Technology Co., Ltd
person: Manager Zhou

Mobile: +86-1836-006-7777

            +86-188-0063-3336

Tel: +86-0527-84550877
Web: www.zzuzl.cn
Add: No.23 Kegong Road,Economic Development Zone, Sucheng District, Suqian city, Jiangsu Province, China


Quality problems in connection and construction of steel strip and pipe
2019-1-8
source:unknown
clicks:  8827        作者:未知
  • At present, the plastic pipe market is not standardized, and the connection products of steel reinforced polyethylene spiral corrugated pipe are no exception. There is no industry standard for heat shrinkable pipe and electric heating pipe used by steel belt pipe manufacturers. The units producing connection parts do not know enough about the characteristics of PE pipe, lack of different products adapting to the structural characteristics of different PE structure wall pipes, and lack of high-quality products to meet the requirements of use. To ensure the quality of the connection. It is suggested that strong production units of connected products should participate in the 8219
    According to our understanding, there are many problems in the quality of construction operation of steel strip pipe connection. Generally, the mechanism of PE pipe connection structure is not well understood, and the structural characteristics of different wall pipes are often neglected. There is a lack of operation procedures verified by connection quality, and operators can not grasp the temperature well.
    From the above several connection technologies, we can see that although the connection construction is not a very complex technical work, the quality of the connection has a great relationship with the quality and working attitude of the construction personnel. The management of the connection construction personnel should be strengthened. All the employees must undergo technical training and pass the examination to be certified.
    We believe that the industry should attach great importance to the quality of sewage pipe materials and sewage pipe connection technology. The key to promote the development of new pipelines is to solve the quality control of the production and on-site operation of the connecting parts.

Address: No.23 Kegong Road,Economic Development Zone, Sucheng District, Suqian city, Jiangsu Province, China  tel: +86-1836-006-7777/+86-188-0063-3336/+86-0527-84550877 Fax: +86-0527-84550877

All Rights Reserved: Jiangsu Huazheng Pipe Technology Co., Ltd. Su ICP Prepared: Su ICP Prepared 16060068 Technical Support: Suqian Webbo

主站蜘蛛池模板: 德兴市| 高台县| 阜新| 塔城市| 福州市| 房产| 浙江省| 武义县| 彰化县| 来凤县| 汝阳县| 穆棱市| 繁峙县| 清流县| 射洪县| 呼伦贝尔市| 英吉沙县| 田阳县| 教育| 大埔县| 开鲁县| 怀宁县| 贺州市| 琼海市| 寿阳县| 资阳市| 滦南县| 开封市| 民县| 从江县| 中阳县| 黑河市| 双城市| 抚州市| 怀化市| 昭觉县| 汉中市| 历史| 奇台县| 宜川县| 永川市|